★ ★ ★ ★ ★ 4.9 Google rating · 27 reviews
Licensed & insured 3-year workmanship warranty Financing options
Customer login → Explore Financing Options → Measure my fence Request a free quote Call (419) 214-2107

Why winter stops most contractors

It is not the cold. It is the concrete.

A fence set the conventional way needs a poured footing at every post, and concrete cures much more slowly as the temperature drops. Below about 40°F it needs warmed water, a cold-weather mix, or insulating blankets over every hole, and you do not pour onto frozen ground at all — frozen soil cannot take up the moisture, so the footing cures unevenly and ends up weaker than the one you paid for. General guidance is to avoid pouring if the temperature will fall below freezing within 24 hours, which in a Toledo January rules out most days.

Add the digging. Frozen clay behaves like rock, so holes need a carbide auger, a breaker, or ground-thawing blankets left out overnight. That is slower, more expensive and much harder on a lawn. Faced with all that, closing for four months is a reasonable business decision.

Why it does not stop us

In clay we do not pour footings. We drive an 8-foot galvanized steel post four feet into undisturbed ground — a foot below the 36-inch frost line Lucas County sets — and there is no concrete anywhere in the job.

Take the concrete out and every winter objection goes with it. Nothing has to cure, so temperature stops mattering. Nothing has to be kept above freezing overnight. There is no waiting between setting posts and hanging panels, because a driven post is load-bearing the moment it is in. And there are no open holes sitting in your yard between visits.

Frozen ground is also not the enemy people assume. A driven post gets its holding from soil closing tightly around its full length, and firm ground does that well. What we are driving through is the top crust; below the frost line the clay is unfrozen and behaves exactly as it does in July.

The fencing year in Toledo A twelve-month strip showing ground conditions through the year: frozen ground in January and February, saturated ground and a high water table through spring, workable ground from June to November, and freezing again in December. Driven steel posts work in every month. Concrete footings are limited by curing temperature in winter and by saturated ground in spring. Most contractors book only the summer months, which is why the queue is longest then. JFM AMJ JAS OND THE GROUND frozen thaw — saturated, water table high workable freezing DRIVEN STEEL — CLAY works every month — no concrete, nothing to cure CONCRETE — SAND cures slowly, needs warm mix wet holes, high water table cures slowly, needs warm mix ideal window EVERYONE ELSE’S QUEUE most shops closed filling up booked out, weeks of wait closing down THE GAP In clay, the months nobody else will work are the months your fence can go up fastest. Frozen ground holds a driven post firmly, and dormant turf takes far less damage than June grass.
The fencing year in Toledo. The band nobody else works is the band with no queue.

What you actually get out of it

  • No queue. In June you are behind everyone who called in April. In January you are not behind anyone.
  • Less damage to your yard. Dormant, firm turf takes machinery far better than soft June grass. Spring is the worst month for ruts, not winter.
  • The fence is up before you want it. Pools open in May, dogs need containing the first warm weekend, and graduation parties are booked in March. A fence finished in February is a fence you never think about again.
  • Prices are what they are. Material costs do not fall in winter and we do not pretend otherwise — what changes is availability, not the number.

Where winter genuinely is not the answer

If your lot is on sand — the Oak Openings ground southwest of Toledo, or the strip along the lake — the right build there is a concrete-set 4×6, and every problem in the first section applies to it. We can do it with warm mix and blankets, but it is fussier work and we will tell you plainly if waiting is the better call for your yard. Why the soil decides which one you get.

Two other honest limits. Deep snow has to come off the line before we can set it out accurately, and if it is falling faster than we can clear it we will move the day. And vinyl gets brittle in hard cold — it goes up fine, but it wants careful handling, so a bitter week may be a cedar week rather than a vinyl one.

We are also not going to work a day that produces a worse fence. If conditions are wrong we move you, we do not push through and hand you something that has to be fixed in April.

From Nick

The call I get most often in March is somebody who wanted the fence up before their pool opened and has just found out the earliest date anyone can offer is July. They could have had it in January. Nobody told them that was possible, because most people they rang had already shut for the season and had no reason to mention it.

Nick Ghareeb, owner

Trace your yard and see the number — whatever month it is.

Measure my fence →

Customer experiences

A word from our customers

See all 27 Google reviews
Google

A winter installation

“Completed my project in the middle of winter and in a timely manner. Great communication along the way. Highly recommend!”

📞 Call Get Free Estimate